Power company in January 2010 Work Summary
This month, at the leadership in the management of careful organization and arrangement, the management office of the units to run the job centers, and detailed arrangements for the production of the rainy season, further strengthening the online operation and management, earnestly carry out transmission and distribution lines and substations and low voltage equipment defect treatment for maintenance, inspection, maintenance and defect treatment, continue to strengthen comprehensive and so on. In particular, the Japanese Bureau of Flood Control Office received a notice of defense fifth typhoon, the management immediately held an emergency meeting at the start of the Flood rescue team leader of the unit and team members are on duty hours, the incident scene immediately after the deal with the problem, ensure that power quality, security, economic, stable and reliable operation, a strong guarantee for the oil and gas production and living normal power supply, the successful completed the month of production tasks. Chinese papers League finishing.
× a, grid load: maximum load million million minimum load, average load of million million increase compared with the previous month growth rate.
× Second, power: The maximum power million, the lowest electricity million, the average electricity million million on the total power supply, power supply and the average daily decline million compared to last year, down rate, the total electricity consumption in January of this year, million compared with same period last year, down rate, which transfer power supply, million, million compared with same period last year, the growth rate.
× of the accident situation: this month due to
× d, this month on completion of the
×, transmission line accident Clause, Clause accident in which lines increase compared with the previous month Clause and Clause increase over the same period last year, transmission lines, distribution lines Clause, increase compared with the previous month compared with last year Clause increase Clause Clause distribution line accidents, increase compared with the previous month compared with last year Clause Clause added. Power factor, increased compared with the previous month, down from last year, power supply reliability rate, accuracy rate of protective actions; scheduling order accuracy.
×, the line of normal inspection, in which lines, line, line, line accident visits. Main completed: installation, replacement arrester only, the replacement of insulators only, the replacement of zero grams of grams of ceramic body only,[link widoczny dla zalogowanych], transformer oil, identification and handling of failure times, and produced a cable head, felling trees, the replacement of lead Department, the identification of cable fault at the line listed block, a strong line to ensure safe and reliable operation.
×, the original hospital on the supply stations were Huangzhuang overhaul of the main transformer and the test pass, and substations, substations of DC panel module was cleaned to ensure the normal operation of the DC system.
×, defect treatment this month at the substations. Tuen Guo, Tuen Guo, LI Jin, LI Jin, Tun Tuo, Tuo switch Tuen protection commissioning, guocun change for switch processing background machine Zhaocun change the location does not correspond to the display device, Li Shui variable transformer on-load tap handle large cover permeability, refinery changes for the main transformer casing iron gland, Gimje Trip Protection switch can not afford to change licensing deal, Union City, changed check, switch protection, Liu Pu Tun Tun variable removed from the protection switch, refinery changes Check the switch a number of devices prepared from the cast, to ensure the safety of the grid, smooth, reliable operation.
×, integrated governance, strengthening the three plant areas, Liu Tuen Mun area inspect transmission lines, governance. In addition to low pinch illegal use of electricity, tampering at the time (including Wuchang District Office of life, living area at the mine.) Dispatching people, families under the payment notice, reminder household electricity, installation, meter replacement pieces, check meter block, measuring check points, sealing Department, replacement units, better control of the power loss.
×, to ensure that the normal residential electricity consumption in summer, at the property of their respective units to actively take measures to living room area of low voltage distribution, power distribution lines, distribution transformer load, temperature, grounding, line g zero grams, the operation of the outdoor distribution cabinets were examined, reform and strengthen the low-voltage power supply system, maintenance of residential customers and management, strengthening the this month, low-voltage equipment maintenance, inspection sets of processing equipment failure at the low voltage, transformer temperature, measuring load times, and times to serve the residents, the replacement of the meter block, a total of three lamp repair, replacement light bulbs, lamp only, replacement, installation switches only, replacement and installation space open only to deal with failure at the measurement, the rectification circuit at low voltage, installation, replacement of the counter force to improve the quality of service for residential customers to provide a comfortable and bright living environment.
×, this month on Sunday, Puyang by the Management Office to do a solid foundation work, as early as end of the month issued a disaster plan for flood control and drainage, leading group was set up flood disaster, rescue team members always on standby, immediately after receiving the notice the bureau launched the plan, the management at the full mobilization, actively involved in flood disaster protection electrical work, only from the date: Sunday:, management, disaster rescue personnel were deployed at times, out of vehicles times, and accident lines of patrol times, dealing with high pressure, low-voltage equipment and wiring fault at times, no large-scale power outages, to ensure normal production of oil and gas and normal life of residents.
× five main work next month:
, continue to conduct inspections of network equipment and load, the temperature of the test.
, continue to do a wire clearance.
, and take all of sudden emergency treatment.
, the shortcomings of network equipment for processing.
, continue to do comprehensive work.